Skip to content
Brass Orrery

Orrery Terrain · Blueprint · Make and Break

Break Orrery Terrain Corridor BP

A linear earthwork (road, rail, canal bank) as Blueprint states it, in cm.

Node

Blueprint Break Orrery Terrain Corridor BP
The graph as text
  1. Break Orrery Terrain Corridor BP (structure)
    • In Orrery Terrain Corridor BP (OrreryTerrainCorridorBP): not connected
    • Out Points (array of Vector): not connected
    • Out Station Spacing (Double): not connected
    • Out Formation Source (EOrreryTerrainFormationSource): not connected
    • Out Formation Offset (Double): not connected
    • Out Half Width Left (Double): not connected
    • Out Half Width Right (Double): not connected
    • Out Crossfall Percent (Double): not connected
    • Out Fill HV (Double): not connected
    • Out Cut HV (Double): not connected
    • Out Keep Out (array of OrreryTerrainKeepOutBP): not connected
    • Out Portal Head Width (Double): not connected
    • Out Portal Fold (Double): not connected
    • Out Portal Depth (Double): not connected
    • Out Portal Facade Offset (Double): not connected
    • Out Portal Opening Width (Double): not connected
    • Out Portal Opening Height (Double): not connected
    • Out Owner Domain (Integer64): not connected
    • Out Owner Id (Integer64): not connected
Palette
The struct’s pin menu (drag from a Orrery Terrain Corridor BP pin), or search “Break Orrery Terrain Corridor BP”
Node
structure
Module
OrreryTerrain

Inputs

PinTypeDefaultMeaning
Orrery Terrain Corridor BPOrrery Terrain Corridor BP——

Outputs

PinTypeMeaning
PointsArray of Vector

The centreline, world cm, at least two points.

Station SpacingFloat

Distance between stations along the centreline, cm.

Formation Source (advanced)EOrreryTerrainFormationSource—
Formation Offset (advanced)Float

Added to the natural ground under each station when FormationSource is GroundPlusOffset, cm.

Half Width Left (advanced)Float

Formation band left of the direction of travel, from the centreline, cm.

Half Width Right (advanced)Float

Formation band right of the direction of travel, cm.

Crossfall Percent (advanced)Float

Formation cross-slope in percent; positive raises the left edge.

Fill HV (advanced)Float

Embankment batter, horizontal per vertical (1.5 = 1.5:1).

Cut HV (advanced)Float

Cutting batter, horizontal per vertical.

Keep Out (advanced)Array of Orrery Terrain Keep Out BP

Runs where the ground is left alone: bridges, viaducts, tunnel bores.

Portal Head Width (advanced)Float

The headwall's outer width of a tunnel opening, centred on the centreline, cm.

Portal Fold (advanced)Float

The length over which the cutting folds to the portal, cm.

Portal Depth (advanced)Float

How far into the hill the opening's hole reaches, cm.

Portal Facade Offset (advanced)Float

Where the facade stands from the keep-out run's end, outward into the cutting, cm.

Portal Opening Width (advanced)Float

The opening's clear width, cm (a rectangular outline).

Portal Opening Height (advanced)Float

The opening's clear height above the formation, cm.

Owner Domain (advanced)Integer64

Owner domain: opaque to the terrain; a FourCC by convention.

Owner Id (advanced)Integer64

Owner id within the domain.

Description

Converted to a OrreryTerrain::Native::FCorridorFeature: the centreline is resampled every StationSpacing along its plan length. CommitCorridorFromSpline ignores Points and samples the spline instead.

How this page is made

Drawn from the C++ declaration’s reflection specifiers, not exported from the editor.

  • the palette lists Make and Break under Utilities, Struct; the reference groups them by struct